Features
Year
2018 - 2019
Façades
-
Place
London, UK
Client
Knight Dragon
General Contractor
MACE
Architect
Diller Scofidio + Renfro
Category
Categories:
Status
Completed
Description
The project is the supply and installation of metallic steel structures for an elevated walkway in the area adjacent to The O2 Arena. The structure consists of principal elements called “islands” which are connected by pedestrian bridges. The project also includes finishing works such as technical and architectural gratings, glass and stainless-steel parapets.
Related projects