Features

Year

2018 - 2019

Façades

-

Place

London, UK

Client

Knight Dragon

General Contractor

MACE

Architect

Diller Scofidio + Renfro

Category

Status

Completed

Description

The project is the supply and installation of metallic steel structures for an elevated walkway in the area adjacent to The O2 Arena. The structure consists of principal elements called “islands” which are connected by pedestrian bridges. The project also includes finishing works such as technical and architectural gratings, glass and stainless-steel parapets.